About the Construction Department
Our essential purpose is to fulfill the needs of our PSJA students and staff by collaborating with the Superintendent, School Board and District Administrators to ensure each PSJA campus is safe, comfortable, functional, and efficient. We facilitate the design, bidding, and construction supervision of school district projects by working closely with consulting Engineers, Architects, and City Officials. Projects range from new campuses, building additions, campus renovations, HVAC upgrades, re-roofing, sports facilities upgrades, and parking lot improvements.
Projects
- PSJA ECHS AQUATICS
- Memorial ECHS Dance Room
- Ballew Cosmetology Lab
- MEMORIAL ECHS AQUATICS
- PSJA North Restrooms Renovations
- Carman Playground
- Santos Livas Playground
- PSJA Memorial Swimming Pool
- PSJA High Swimming Pool
- New PSJA Ag Facility
- PSJA North Baseball Field Improvements
- Carman & Livas Playground Improvements
- PSJA ECHS & Memorial Re-Roofing
- Garcia, Clover & Doedyns HVAC Hallways
- PSJA North ECHS & Dr. King College and University Center Restroom Renovations and Science Labs Renovations
- New PSJA ISD Swimming Facilities
- PSJA Memorial Baseball Field Improvements
- PSJA Memorial Softball Field Improvements
- Buell, Franklin & Carnahan HVAC @ Gyms
- Reed-Mock Re-Roofing
- Elvis J. Ballew Renovations & Parking lot improvements
- Buell Central & Clover Elementary RE-Roofing
- PSJA ISD & City Of Pharr Aquatic Center
PSJA ECHS AQUATICS
Memorial ECHS Dance Room
Ballew Cosmetology Lab
MEMORIAL ECHS AQUATICS
PSJA North Restrooms Renovations
Carman Playground
Santos Livas Playground
PSJA Memorial Swimming Pool
PSJA High Swimming Pool
New PSJA Ag Facility
New PSJA Ag Facility
New 38,000 square foot facility to include space for 81 hop pens and 54 large animal pens and animal wash areas. Equipped with adequate storage areas with cabinets for students, student/staff restrooms & office. Also includes a small 8,000 square foot arena for small shows and an exercise area.
Project Name: PSJA Agricultural Facility
Architect/Engineer: Gignac Architect
Contractor: Holchemont
Estimated Completion Date:
Project Cost:
PSJA North Baseball Field Improvements
PSJA North Baseball Field Improvements
Complete renovations of baseball fields at PSJA Southwest, North & Memorial with synthetic turf at the infield and new sprinkler and sod at the outfield. Complete renovation of softball fields at PSJA ECHS, Memorial & North with new synthetic turf for the entire field. Also new masonry low-wall backstop with 4-pole netting system at each field.
Project Name: PSJA North Baseball Field Upgrades
Architect/Engineer: PBK Sports
Contractor: FieldTurf USA
Estimated Completion Dat:
Project Cost:
Carman & Livas Playground Improvements
Carman & Livas Playground Improvements
This projects consist of parking lot addition, 5’ wide decomposed granite walking trail with lighting, restroom facility, 2 full size basketball courts with lighting, exercise area and grass play areas with new grass and sprinkler system. Carman will have a new playscape system.
PSJA ECHS & Memorial Re-Roofing
PSJA ECHS & Memorial Re-Roofing
This project consists of the complete roof replacement of the flat roof areas at Memorial and the roof over-lay of the metal roofed areas (Gyms & Fieldhouse) at PSJA ECHS. Project also includes the replacement if the clearstory windows a PSJA ECHS center court area & Memorial Library.
Project Name: PSJA Memorial High Re-Roofing
Architect/Engineer: Milnet Architectural Services
Contractor: Argio Roofing & Construction
Estimated Completion Date:
Project Cost:
Garcia, Clover & Doedyns HVAC Hallways
PSJA North ECHS & Dr. King College and University Center Restroom Renovations and Science Labs Renovations
PSJA North ECHS & Dr. King College and University Center Restroom Renovations and Science Labs Renovations
This project consist of the complete renovation of the student restrooms at PSJA North ECHS. New plumbing fixtures and accessories, toilet partitions and floor and walls finishes. This project also includes the renovations of 3 sets of restrooms at the Dr. King C&U Center and the renovation of 4 dual credit science labs equipped with new casework, student and teacher stations & fume hoods.
Project Name: PSJA North & Dr. King College & University Center Restrooms & Science Labs Renovations
Architect/Engineer: Gignac Architects
Contractor: G & G Contractors
Estimated Completion Date:
Project Cost:
New PSJA ISD Swimming Facilities
New PSJA ISD Swimming Facilities
This Project includes a new outdoor 25-yard x 25-meter pool and a 3-lane x 25-yard instructional pool at both PSJA ECHS & Memorial. Pools are covered by a metal canopy. Each facility includes student locker room areas, restrooms for students and visitors. Bleachers for spectators, a coach office with locker area, and a multipurpose classroom. Each facility includes a new parking lot.
PSJA Memorial Baseball Field Improvements
PSJA Memorial Baseball Field Improvements
Complete renovations of baseball fields at PSJA Southwest, North & Memorial with synthetic turf at the infield and new sprinkler and sod at the outfield. Complete renovation of softball fields at PSJA ECHS, Memorial & North with new synthetic turf for the entire field. Also new masonry low-wall backstop with 4-pole netting system at each field.
PSJA Memorial Softball Field Improvements
PSJA Memorial Softball Field Improvements
Complete renovations of baseball fields at PSJA Southwest, North & Memorial with synthetic turf at the infield and new sprinkler and sod at the outfield. Complete renovation of softball fields at PSJA ECHS, Memorial & North with new synthetic turf for the entire field. Also new masonry low-wall backstop with 4-pole netting system at each field.
Buell, Franklin & Carnahan HVAC @ Gyms
Reed-Mock Re-Roofing
Elvis J. Ballew Renovations & Parking lot improvements
Elvis J. Ballew Renovations & Parking lot improvements
This project consist of the complete removal and replacement of the existing parking lot, new playground and canopy for the daycare, new entry canopy, exterior paint and replacement of entry façade metal panels. The project also includes an outdoor eating area for the campus.
Buell Central & Clover Elementary RE-Roofing
PSJA ISD & City Of Pharr Aquatic Center
PSJA ISD & City Of Pharr Aquatic Center
This project consist of a new fully enclosed natatorium to include a 25 yard x 50 meter pool, diving pool with drive platforms, student dressing/locker areas, visitor restrooms & spectator seating area for 1,000.
PROJECT NAME: PSJA & CITY OF PHARR AQUATIC CENTER
ARCITECT:
CONTRACTOR:
COMPLETION DATE:
PROJECT COST $
Completed Projects
- Kennedy Dance Floor
- 3 Walk-In Freezers (Dr. Long, Carman & LBJ)
- Elvis J. Ballew (East Canopy & Playground) UIG
- Reed-Mock Re-Roofing
- 3 HVAC - Carnahan, Franklin & Buell - Gyms
- Kelly-Pharr & Liberty Fire Alarm Upgrades
- Garcia & Livas Parking Lot Improvements
- Doedyns Parking Lot Upgrades
- PSJA Administration & LBJ Cafe Re-Roofing
- Baldemar Cano Chillers
- HVAC Upgrades - 5 Schools (Units & Controls)
- PSJA North Special Education Classroom Expansion
- Kelly-Pharr Special Education Restroom
- Buckner Renovations (Early Head Start)
- Dr. Daniel P. King PSJA College & University Center
- Kennedy Athletic Fields
- PSJA North ECHS Courtyard Improvements
Kennedy Dance Floor
3 Walk-In Freezers (Dr. Long, Carman & LBJ)
Elvis J. Ballew (East Canopy & Playground) UIG
Reed-Mock Re-Roofing
3 HVAC - Carnahan, Franklin & Buell - Gyms
Kelly-Pharr & Liberty Fire Alarm Upgrades
Garcia & Livas Parking Lot Improvements
Doedyns Parking Lot Upgrades
PSJA Administration & LBJ Cafe Re-Roofing
Baldemar Cano Chillers
HVAC Upgrades - 5 Schools (Units & Controls)
PSJA North Special Education Classroom Expansion
Kelly-Pharr Special Education Restroom
Buckner Renovations (Early Head Start)
Dr. Daniel P. King PSJA College & University Center
Kennedy Athletic Fields
PSJA North ECHS Courtyard Improvements
PSJA North ECHS Courtyard Improvements
This project consists of the complete renovation of the interior courtyards of the campus. The improvements include a new drainage storm system, landscape and sprinkler system, new pavers and stone walkways, clock tower and monument sign.
Project Name: PSJA North Courtyard Improvements
Engineer/Engineer: Melden & Hunt
Contractor: Celso Gonzalez Jr.
Estimated Completion Date:
Project Cost: